condominium in Lake George, New York was built in an environmentally sensitive
watershed. This 12,000 GPD system with denitrification has some unique aspects
that include a steep hillside installation and multiple disposal areas
throughout the development. The effluent from the treatment plants passes
through continuous backwash sandfilters to a holding tank that utilizes 28
motorized ball valves to distribute the effluent to the various
fields. |