SBR

Lab Tests

Modem
Control

back to:
Projects

Contacts

Lake George, New York

A seasonal condominium in Lake George, New York was built in an environmentally sensitive watershed. This 12,000 GPD system with denitrification has some unique aspects that include a steep hillside installation and multiple disposal areas throughout the development. The effluent from the treatment plants passes through continuous backwash sandfilters to a holding tank that utilizes 28 motorized ball valves to distribute the effluent to the various fields.

If you would like to learn how Walden can custom design a wastewater treatment plant for your application, drop us a line, or call 207-873-4234.

Top of Page

 

Projects Page

 

E-mail Walden

All rights reserved - Walden Corporation 2001